Design MetatextIn Progress
Act 3
Wadi Qelt and the Merkabah control station.
Act 3 uses canyon walls, aqueducts, cliff structures, and buried waterworks as a vertical route into the Wadi Qelt station. The act ends with Michael and the shutdown of the Merkabah.